Fort Meade Data Center Project

A proposed data center development within the City of Fort Meade, led by Stonebridge Data Centers. It would be built in phases on a fully entitled site, with the first building targeted for completion in early 2028.

Pictured: a representative modern data center campus. Not the Fort Meade site.

Project overview

The project at a glance

Developer
Stonebridge
Location
City of Fort Meade, Polk County
Site size
About 1,330 acres
First building
Targeted for early 2028

Site access

From State Road 630 (W Broadway) and U.S. Highway 17.

Distance from downtown

About 1.75 miles from downtown Fort Meade.

Distance from homes

About 1.55 miles from the nearest residential area.

Site plan

How the site is laid out

The concept plan places the buildings near the center of the roughly 1,330-acre property, with the main entrance off U.S. Highway 17 and building setbacks around the edges.

Aerial concept site plan showing eight proposed buildings in the center of the property, a proposed substation to the west, a proposed pond to the northeast, and an access road from U.S. Highway 17.
Conceptual site plan. Final design subject to review and approval.

Contact us

Questions about the project?

Send the project team a message and we’ll get back to you. You can also reach us by phone or email.

Fields marked * are required.